Modular Classrooms
Charter Schools
Classrooms

Modular School Buildings Buying Guide

Jun 16, 2025
Share

2 classrooms

  • 28’ x 64’ | 1,792 sq. ft.

4 classrooms

  • 56’ x 64’ | 3,584 sq. ft.

6 classrooms

  • 84’ x 64’ | 5,376 sq. ft.

8 classrooms

  • 112’ x 64’ | 6,168 sq. ft.

10 classrooms

  • 140’ x 64’ | 8,960 sq. ft.

2 classrooms, 2 restrooms

  • 28’ x 64’ | 1,792 sq. ft. 

4 classrooms, 3 restrooms

  • 68’ x 64’ | 4,352 sq. ft.

6 classrooms, 3 restrooms

  • 96’ x 64’ | 6,144 sq. ft.

8 classrooms, 3 restrooms

  • 124’ x 64’ | 7,936 sq. ft.

10 classrooms, 3 restrooms

  • 152’ x 64’ | 9,728 sq. ft.

4 classrooms, 2 offices

  • 70’ x 64’ | 4,480 sq. ft.

6 classrooms, 2 offices

  • 98’ x 64’ | 6,272 sq. ft.

8 classrooms, 2 offices

  • 126’ x 64’ | 8,064 sq. ft.

10 classrooms, 2 offices

  • 154’ x 64’ | 9,856 sq. ft.

4 classrooms, 3 restrooms, 2 offices

  • 82’ x 64’ | 5,248 sq. ft.

6 classrooms, 3 restrooms, 2 offices

  • 110’ x 64’ | 7,040 sq. ft.

8 classrooms, 3 restrooms, 2 offices

  • 138’ x 64’ | 8,832 sq. ft.

10 classrooms, 3 restrooms, 2 offices

  • 166’ x 64’ | 10,624 sq. ft.

4 Pre-K classrooms, 5 restrooms

  • 68’ x 64’ | 4,352 sq. ft.

6 Pre-K classrooms, 2 offices, 9 restrooms

  • 108’ x 64’ | 6,912 sq. ft.

8 Pre-K classrooms, 2 offices, 9 restrooms

  • 136’ x 64’ | 8,704 sq. ft.

10 Pre-K classrooms, 4 offices, 17 restrooms

  • 176’ x 64’ | 11,264 sq. ft.

Whether you need seating for a lunchroom, classroom, lab, or administrative office, our basic and premium seating packages allow you to choose from different styles and sizes of tables and chairs. 

Including all the essentials, from desks and chairs to file cabinets and floor mats, our office packages are designed to ensure your administrative staff has everything they need to get to work on day one. 

Ensure that your modular school building is accessible for all students, teachers, and staff with ADA-compliant stairs or ramps. We also offer entryway necessities such as canopies, mats, and coat racks.

  • Upgraded locking hardware
  • Key card entry system
  • Security door stops
  • Bullet-resistant windows
  • Vestibules
  • Fisheye viewers for doors
  • Safe rooms
  • Adequate lighting
  • Minimized points of entry
  • Control room
  • Keyed light switches
  • Two-way communication with the main office
  • Surveillance cameras
  • Motion detectors
  • Intrusion alarm systems
  • Public address system
  • Room numbers on windows
  • Labeled evacuation routes
  • Distinctly labeled buildings
  • Panic or duress alarm
  • Secured space underneath buildings

Modular buildings are built with various materials and exterior finishes that can be customized to your needs. We offer a diverse selection of all building components, including: 

  • Steel/concrete (framework)
  • Wood (framework and siding)
  • Composite exterior panels (siding)
  • Stone veneer (siding)
  • Stucco (siding)
  • Thin brick (siding)
  • Vinyl (siding and flooring)
  • Ceramic tiles (flooring)
  • And more!

Permits and licensing can vary greatly depending on counties, cities, and states. Local permits and licenses cover safety, structural integrity, and proper use. The approval process typically involves submitting detailed plans, specifications, and site details to the local building department. 

Additionally, many states have specific programs for modular building certification. These programs involve design approvals, factory inspections, and site inspections. State agencies will typically oversee these processes, ensuring compliance with state-specific building codes.

With consistent upkeep, temporary modular buildings can reliably serve their purpose for 25 to 30 years. Furthermore, permanent modular buildings offer a lifespan comparable to conventionally constructed buildings, often lasting 35, 50, or even more years. 

Ready to solve your space needs?

Modular buildings are the way to go. Request a quote or contact us today to get the conversation started. We’d love to talk to you about how modular can meet — and exceed — your needs.

back to top