Not in the USA?
Switch to Canada
  • Education

Disaster Recovery After the Fire: Modular Solutions for Kansas School

4 mins read

Disaster Recovery After the Fire: Modular Solutions for Kansas School
Client industry
Education
Project Type
High school
Usage
Classrooms, Locker Room with Showers, Office
Location
Atwood, Kansas
Contract Type
Lease
  • 6 modular buildings provided to replace unusable high school facilities
  • Combination of classrooms, locker room with showers, and administrative office 
  • Ramps and stairs to support accessibility and functionality 
  • Rental solution installed before the start of the new school year

The Project

When a fire left Rawlins County USD 105’s high school unusable, the district urgently needed alternative facilities to house students and staff. With the new school year approaching, the district needed a solution that could restore essential learning spaces quickly and minimize disruption to students’ education.

The Challenge

What They Needed

    • Classroom space to accommodate students displaced by the fire
    • • Additional facilities to support school operations, including administrative offices and locker rooms
    • • A fast solution that would be ready before the start of the new school year
What BOXX Modular Delivered

  • • Six modular buildings supplied through a rental contract
  • • One 8-classroom, one 4-classroom, and two 2-classroom buildings
  • • One locker room with showers
  • • One administrative office

The Outcome

BOXX Modular provided Rawlins County USD 105 with six modular buildings to help replace the high school facilities made unusable by the fire. The solution included four classroom buildings of varying sizes, a locker room with showers, and an administrative office to support the district’s immediate needs.

By choosing modular buildings for rent, the district could secure essential facilities without waiting for the longer timeline associated with traditional construction. Ramps and stairs were also included to support access and functionality across the site.

All six buildings were installed and ready before the start of the new school year, helping students return to learning with minimal disruption. The project demonstrates how modular construction can provide a fast, flexible solution for schools facing unexpected facility emergencies.

Products Used in this Project