Addressing Overcrowding: Temporary Modular Classrooms for Growing School

4 mins read

Addressing Overcrowding: Temporary Modular Classrooms for Growing School
Client industry
Education
Project Type
Elementary School
Usage
Classrooms
Location
Cumberland, Maine
Size
22,300 sq. ft.
  • Schiavi Leasing delivered two modular classroom buildings totaling 22,300 sq. ft.
  • The buildings added 22 classrooms to help ease overcrowding
  • Both buildings were integrated into the existing school campus

The Project

Mabel I. Wilson School in Cumberland, Maine, faced a pressing challenge of overcrowding. As the school district worked on long-term solutions, they turned to Schiavi Leasing, a BOXX Modular company, for an efficient, temporary fix.

To alleviate overcrowding, Schiavi Leasing delivered and installed two large modular classroom buildings tailored to the school’s immediate needs.  

The Challenge

What They Needed
  • Additional classroom space to help alleviate overcrowding
  • Restroom facilities to support students and staff
  • A solution that could be integrated with the existing school campus
  • A timely installation with minimal disruption to school activities
What We Delivered


Schiavi Leasing provided and installed two modular classroom buildings:

  • Building 1 – 10,200 sq. ft.: 10 classrooms and a restroom with 6 toilets

  • Building 2 – 12,104 sq. ft.: 12 classrooms and a restroom with 8 toilets 


The Outcome

The two modular buildings gave Mabel I. Wilson School 22,300 sq. ft. of additional space, including 22 classrooms and dedicated restroom facilities. The solution helped the school address immediate overcrowding while maintaining its focus on students and day-to-day educational operations.

Modular classrooms offer schools a flexible way to respond to changing space requirements, whether driven by enrollment growth, renovations, or campus expansion. For Mabel I. Wilson School, the partnership with Schiavi Leasing provided the additional capacity needed while the district continued working toward its long-term plans.