Polk County School
From design to installation, the BOXX Modular team smoothly executed the project, ensuring minimal disruption to the school's operations. Unlike traditional construction, modular buildings are produced off-site in a controlled environment and then transported to the site and assembled, significantly reducing the overall construction timeline.