A Modular Office Solution for a Growing Concrete Operation

4 mins read

A Modular Office Solution for a Growing Concrete Operation
Client industry
Mining, Minerals & Aggregates
Project Type
Concrete Plant
Usage
Plant Office & Control Center
Location
Raleigh, North Carolina
Size
1,000 sq. ft.
  • 1,000+ sq. ft. modular office supporting plant operations and administration
  • Off-site construction minimized disruption while the new concrete plant was being installed
  • Durable interior and exterior finishes designed for an industrial environment
  • Fast installation allowed the team to occupy the building quickly

The Project

As Eagle Rock Concrete prepared to open a new ready-mix concrete plant in Raleigh, the team was managing multiple priorities, from developing the site and installing plant equipment to training personnel and preparing for operations. 

Rather than adding a lengthy traditional office construction project to the schedule, Eagle Rock Concrete partnered with BOXX Modular to provide a durable modular office that could be built quickly while other work continued on-site.

The Challenge

What They Needed

  • A high-quality, durable office building for their new concrete batch plant.
  • A fast construction solution to avoid delaying plant setup and operations.
  • Minimal disruption to the jobsite while equipment was installed.
  • A move-in-ready workspace that would allow personnel to occupy the building quickly.
What BOXX Modular Delivered

  • A permanent office to support the new concrete plant 
  • Fast delivery to keep the facility opening on schedule 
  • Minimal on-site construction while plant equipment was being installed 
  • Durable finishes suitable for a demanding industrial environment 
  • Functional space for plant controls and administrative operations

The Outcome

BOXX Modular constructed the office off-site while Eagle Rock Concrete continued preparing its new Raleigh facility. This approach kept additional construction crews away from the active site while critical plant equipment was being installed. 

Once completed, the modular office was delivered and installed with minimal additional on-site work, allowing Eagle Rock Concrete's team to occupy the building quickly. 

At just over 1,000 sq. ft., the 24' x 44' building serves as the plant's nerve center, housing both control systems and administrative functions. Durable materials were selected for the industrial environment, including a painted ribbed-steel exterior and heat-welded Corlon flooring for a long-lasting interior finish. 

By choosing modular construction, Eagle Rock Concrete gained a high-quality, durable office on an accelerated timeline while allowing its management team to stay focused on getting the new plant operational.