Not in the USA?
Switch to Canada

Build More Where Building Is Difficult

Site constraints don't have to limit your options. With much of the construction completed offsite, modular provides more ways to add space while reducing onsite disruption.

Build Offsite. Install Onsite.

Traditional construction brings most of the building process to your site. Modular does things differently.

Your modular building is constructed away from your property while site preparation can take place separately. Once the building and site are ready, the modules are transported to your location and installed.

That shifts a significant portion of building activity away from your property, an important advantage when you're working around employees, students, customers or ongoing operations.

Your Projects in Action

Check out real examples of projects where choosing modular helped our client get around their site constraints.

Still Learning About Modular?

Visit our Modular 101 page

Get all the information you need to make an informed decision.


Answer a few quick questions to get matched with the right solution

Frequently Asked Questions

How are modular buildings delivered and installed?

Modular buildings are constructed offsite and then transported to your property. Once onsite, the modules are positioned and installed to create the completed building. The specific delivery and installation approach depends on the building, site and project requirements.

Can you install a modular building on a site with limited access?

Potentially. Site access is an important part of determining whether a modular solution is appropriate and how the installation should be approached. Factors such as access routes, available installation space and building configuration should be evaluated during project planning.

Can my facility stay operational during the project?

That depends on the site and project, but one advantage of modular construction is that much of the building work takes place offsite. This reduces the amount of building construction that needs to occur at your property. Your project team can help plan delivery and installation around the requirements of your active site.

Can a modular building be installed using a crane?

Depending on the building and site conditions, lifting equipment may be used to position modules during installation. The appropriate installation method is determined based on the requirements of the individual project.