Once all on-site preparation is complete, building installation can occur. At this time, the modules are delivered and staged in a specific order to make the final assembly run smoothly and efficiently.
Once the modular pieces are placed onto the foundation, the individual building components are seamed together. At this point, utility connections are made, interior finishes (ceiling, flooring, and trim work), and exterior additions (decks, ramps, and stairs) are completed.
Compared to traditional construction, the overlapping on-site and off-site progress of modular construction can reduce your time to occupancy by up to 50%.